von Earth Anchors | Jul 10, 2017
Mackay's Crossing to Pekapeka, V129 Pipeline - New Zealand Project Specification A 12″ gas pipeline was laid through sandy soils that were prone to a high water table and liquefaction and so a permanent buoyancy control solution was required that could be installed...
von Earth Anchors | Jul 10, 2017
Reynoldswood Drive Drainage Improvements - USA Project Specification The county of Hillsborough improved the outfall from the Reynoldswood subdivision pond through a conveyance system along Ehrlich Road to the tributary of Sweetwater Creek. By constructing a new swale...
von Earth Anchors | Jul 10, 2017
Gaz De France - Calais, France Project Specification A 14km high pressure gas pipeline needed to be laid through the northern part of Calais. High water levels meant that buoyancy control measures were required to hold the pipeline in position. Conventional methods...
von Earth Anchors | Jul 10, 2017
Towne Center at Haddon Underground Storage System - USA Project Specification In an effort to redevelop the Haddon business district, a mixed-use apartment and retail center was constructed in the urban downtown in the hopes of bringing several hundred residents to an...
von Earth Anchors | Jul 10, 2017
Decompartmentalisation & Sheetflow Enhancement of Water Conservation - USA Project Specification The Water Conservation Area 3 (WCA-3) Decompartmentalization and Sheetflow Enhancement Project (Decomp Project) is designed to restore the natural ecology and...